午夜精品久久久久久久2023-午夜精品久久久久久久90蜜桃-午夜精品久久久久久久99-午夜精品久久久久久久99热-午夜精品久久久久久久99热浪潮-午夜精品久久久久久久第一页

Silk mouth backflow preventer

Products > Hydraulic control valve > Silk mouth backflow preventer

Silk mouth backflow preventer

Model: HS11X-16T
Nominal diameter: DN40 ~ 100mm
Nominal pressure: PN1.0 ~ 1.6MPa
Suitable temperature: 0 ~ 80 ℃ (if necessary, up to 200 ℃)
Flange standard: GB / T17241.6, GB / T9113
Test standards: GB / T 13927, API598
Contact purchase
shared:

First, the product description:
 HS11X-16T silk mouth backflow preventer is to repair the pipeline and power, the tap water is often interrupted, once the power supply is restored, tap water becomes yellow and dirty, it is due to the process of water, from the fire pipe , Unoccupied buildings or water pipes have not yet used the branch of the backwater, rust water back. In order to allow residents to drink clean water, backflow preventer this device can effectively prevent the occurrence of dirty water in the above circumstances, not only ensure the safety of residents drinking water, but also save water resources. According to the introduction of China Building Standard Design Institute, the Ministry of Construction has revised the relevant national standards and installed "backflow preventer" on the building water supply pipelines.  


 Second, the product structure:
 Backflow prevention device is composed of two levels of back-stop system and a drainage pressure relief system. The drainage pressure relief system upper chamber is connected with the inlet end of the first-stage check-back system. 
 The first and second-level check-back system is mainly composed of the valve body, inlet joint, disc, gaskets, springs and so on. 
 Drainage pressure relief system is mainly composed of valve cover, diaphragm, valve core, gaskets, drain, spring, air baffle, etc. The outlet of air baffle must be connected to the drainage pipe network or sewer.


 Third, the working principle:
 Backflow prevention device is added in the secondary checkback system, a drainage pressure relief device, so that even if the secondary check seal at the same time damage, it can also play a role in preventing backflow pollution. Its working principle: 
 1. Normal water supply: 
 a. Clean municipal water from the first-class check-back system through the drain to the second-level check-back system to export water to users, the first-level check-in system to import high-pressure water into the drainage diaphragm Cavity, and the diaphragm under the cavity and the first stage check valve outlet (second stage check valve inlet) communicating, due to its existence of a certain pressure difference ΔP1 = 0.035MPa, pushing the valve flap down, drain closed, backflow preventer Normal water supply; 
 b. When the valve after the pipeline without users, water still. Such as the inlet pressure remains unchanged, there is pressure before and after the drain is still closed, such as the inlet pressure drops, the intermediate chamber and the valve differential pressure ΔP1 ≤ 0.022MPa, then the drainage control spring to open the spool, open the drain Allow the middle chamber to drain, keeping ΔP1 at 0.035 MPa. 
 
 2. seal failure: 
 a. Backflow preventer after the pipe network pressure rises above the valve inlet pressure, such as the second check valve seal intact, high-pressure water will not backflow, the diaphragm up and down to maintain the original pressure Poor, drain closed, no pressure relief. When the second check valve seal leak damage, the second check valve before the pressure increases, resulting in lower diaphragm pressure drop across the drain, drain open, drain pressure relief; this time, such as the first stop Check valve seal damage at the same time, as the second-stage check valve back to the high-pressure water has been decompression, it will not back to the first-class check valve. 
 b. When the valve pressure is higher than the pressure before the valve, such as water pressure continues to decline, the pressure on the diaphragm diaphragm pressure drop, the safety control valve to open the drainage spring drainage regulator drainage. When the inlet pressure drops to zero or negative pressure, the drain opens completely, the water is drained and the air enters the vacuum chamber through the drain to prevent siphon backflow.
 
 3. The valve opening pressure ≤ 0.07MPa, the specification provides in the range of 0.06 ~ 0.1MPa, inlet check valve working pressure is 0.035MPa. 
 
 The main shape and installation size:

Specification DN (mm)

Total length

Inlet and outlet pipe diameter (in)

Drainage pipe diameter (in)

Weight (kg)

DN15

169

1/2

1/2

1.2

DN20

172

3/4

1/2

1.4

DN25

236

1

1/2

3.5

DN32

321

11/4

3/4

7

DN40

321

11/2

3/4

7

DN50

321

2

1

10


主站蜘蛛池模板: 色婷婷亚洲综合 | 夭天曰天天躁天天摸在线观看 | 久久精品国产亚洲5555 | 91美女视频 | 波多野结衣中文字幕一区二区 | 久久色伊人| 亚洲欧美日韩综合在线一区二区三区 | 两个人看的www视频中文字幕 | 一区二区三区亚洲 | 亚洲乱码视频在线观看 | 国产精品岛国久久久久 | 超级碰碰永久免费视频播放 | 亚洲狠狠婷婷综合久久久久网站 | 欧美一区二区三区不卡视频 | 99国产在线观看 | 国产a免费 | 日韩免费一区二区三区在线 | 99热久久国产精品 | 欧美亚洲午夜 | 日本人成大片在线 | 国产成人亚洲精品77 | 美女网站免费久久久久久久 | 日韩一级免费视频 | 清纯偷拍精品视频在线观看 | 欧美乱操 | 97在线观看免费视频 | 日韩在线观看视频网站 | 深爱综合网 | 国产一区二区三区四区蜜芽 | 最近高清中文字幕大全1 | 99精品久久久久久久 | 亚洲国产精品高清在线一区 | 在线观看jyzzjyzz | 欧美成人在线观看 | 亚洲日日干| 中文字幕第一页在线视频 | 免费看三级全黄 | 天天操天天射天天舔 | 狠狠色丁香婷婷久久综合考虑 | 激情宗合网 | 国产日韩不卡免费精品视频 |